Since the 66kV cable terminal that Guolian put into operation in Fuxin Power Plant in 2002, Guolian has continued to provide stable and reliable products for power grid, energy and chemical industry, rail transit and other important industries, and has become a supplier of power products in the whole link of power generation, transmission, transformation, distribution, electricity consumption and so on.

 

In 2006, the renewable energy law came into force, officially starting the development of renewable energy. In 2007, the national development and Reform Commission issued the medium and long term development plan of renewable energy, ushering in the golden period of China's wind power industry. Guolian cable accessories provided cable accessories products and installation technical services for wind power projects such as CPI, Datang, Huaneng and Huadian from 2008 to 2012. So far, these projects have operated safely for more than 10 years.

 

In 2010, the State Grid Corporation of China began to conduct centralized bidding and procurement of 110kV cable accessories, and Guolian won the bid continuously, becoming the supplier of cable accessories of the State Grid.

  • Onshore Wind/Offshore Wind Projects

    Onshore Wind/Offshore Wind Projects

    Onshore Wind/Offshore Wind Projects
    In 2007, China's wind power industry entered a golden period. Guolian participated in onshore wind power projects such as Datang and Huaneng, and in 2019, it participated in Yudean Zhanjiang Wailuo offshore wind power project.
  • 2010 State Grid won the bid

    2010 State Grid won the bid

    2010 State Grid won the bid
    In 2010, the State Grid started the centralized bidding and procurement of 110kV cable accessories and won the bid of the League of Nations
  • 220kV project in severe cold environment

    220kV project in severe cold environment

    220kV project in severe cold environment
    Severe cold environment Mohe North Pole Village 110kV Christmas Village Red River Valley New Construction, Harbin Bin County Wind Power Transmission 220kV Line Project
  • Southern Net Silver Dragon Bridge OFFSET Project

    Southern Net Silver Dragon Bridge OFFSET Project

    Southern Net Silver Dragon Bridge OFFSET Project
    OFFSET high-voltage cable bridge laying telescopic compensation device solves the problem of telescopic compensation for three-circuit double-layer high-voltage cable bridge laying in narrow cable channels
Previous page
1

International projects undertaken:

Power station construction of North Korea National Electric Power Administration

North Korea Weiyuan County Chinese border transmission industrial power project

Annual output of 2.2 million tons of steel project of Indian Electric Steel Corporation

Zambia Lusaka West Power Plant

Bangladesh ktst coal power station construction project

Ekhman electrolytic manganese and silicomanganese project in Gabon

Urban power grid project in Libreville, Gabon

Nigeria 330kV power station substation 132kV transmission line tower overall displacement project

Guinea jibro hydropower station upstream regulation reservoir project, etc

Cooperative enterprise

售后
售后
售后
售后
售后
售后
售后
售后
售后
售后
售后
售后
售后
售后
售后
售后
底部logo

Add:Yuhongshaling Electric Power Industrial Park, Shenyang City, Liaoning

Copyright glfj.cn All rights reserved        辽ICP备05022570号            Powered by 300.cn Shenyang   SEO TAG